ico-game-tile-shape Asset 1 ico-game-tile-shape
$1,285,535,725 returned to Idaho since 1989! VIP Club
$1,285,535,725

returned to Idaho since 1989!

Back

Where the Money Goes

In Fiscal Year 2023 the Idaho Lottery returned a record-setting dividend of $82 million to the people of Idaho. Over the course of 34 years, the Idaho Lottery now has returned over $1.189 billion to the people of Idaho.

Use this search to see how and where the funds were distributed.

  • ARTEC Charter School

    FY21 Amount: $0
    Total Since 1990: $200,238
    FY20 Use: Not required to report

  • ARTEC-I Charter School

    FY21 Amount: $0
    Total Since 1990: $31,278
    FY20 Use: Not required to report

  • Aberdeen

    FY21 Amount: $47,188
    Total Since 1990: $0
    FY20 Use: Repairs and maintenance as needed. Repairs to the middle school roof and air conditioning units, elementary school cooling tower, gym bleacher repairs

  • Alturas International Academy

    FY21 Amount: $39,467
    Total Since 1990: $158,237
    FY20 Use: Not required to report (§ 33-1019, I.C.)*

  • Alturas Preparatory Academy, Inc.

    FY21 Amount: $0
    Total Since 1990: $0
    FY20 Use: Leased facility

  • American Falls Joint

    FY21 Amount: $101,092
    Total Since 1990: $2,518,662
    FY20 Use: Classroom carpet, new boiler at elementary school, repair high school heating system

  • American Heritage Charter School

    FY21 Amount: $27,773
    Total Since 1990: $176,545
    FY20 Use: Modular classroom modification/reconfiguration and setup; carpet repair/replacement; fire alarm repairs; plumbing projects; HVAC/electrical improvement/repair/ CVT tile replacement and refinishing; bathroom stall repairs; painting

  • Another Choice Virtual Charter School

    FY21 Amount: $34,005
    Total Since 1990: $301,460
    FY20 Use: Not required to report

  • Anser Charter School

    FY21 Amount: $29,288
    Total Since 1990: $338,152
    FY20 Use: Classroom painting, fire systems repair and maintenance, plumbing repairs, HVAC maintenance, alarm/door system upgrade. Install new classroom carpet, install new drinking fountain, portable repairs

  • Arbon Elementary

    FY21 Amount: $1,277
    Total Since 1990: $35,259
    FY20 Use: Final payment for flooring for gym and general maintenance

  • Avery

    FY21 Amount: $1,597
    Total Since 1990: $58,149
    FY20 Use: Regular upkeep and contracted annual service.

  • Basin

    FY21 Amount: $22,030
    Total Since 1990: $636,175
    FY20 Use: Repairs to roof and dry fire sprinkler system, repaint walls, resurface and paint gym bleachers, doors, repair plumbing, cement repair, window repairs, extended resource calming rooms, HS teaching kitchen, sump pumps, fence repair

  • Bear Lake County

    FY21 Amount: $89,112
    Total Since 1990: $2,185,600
    FY20 Use: Maintenance Personnel, Maintenance Repairs, Asbestos Removal, Carpet Replacement, School Roof Repairs, School Security Systems, Georgetown Bathroom Remodel, Window Replacement (Egress Windows at AJ Winters Elem.)

  • Bingham Academy Charter

    FY21 Amount: $7,469
    Total Since 1990: $49,435
    FY20 Use: General building maintenance and repairs. Carpet squares, trim work, re-keying doors.

  • Blackfoot

    FY21 Amount: $273,571
    Total Since 1990: $6,728,736
    FY20 Use: Flooring in various schools, remodeled high school bathrooms

  • Blackfoot Charter Community Learning Ctr.

    FY21 Amount: $30,343
    Total Since 1990: $331,106
    FY20 Use: General upkeep and maintenance of facilities, new heaters in PE room MS, new lighting at elementary

  • Blaine County

    FY21 Amount: $209,070
    Total Since 1990: $4,857,633
    FY20 Use: Phase 3 of STEAM classroom remodel, Hemingway front building remodel, carpet replacement, interior paint; phase 2 of the Hailey Elementary Kinder remodel; Carey HS gym ceiling repairs

  • Bliss Joint

    FY21 Amount: $6,889
    Total Since 1990: $295,631
    FY20 Use: Bathroom remodel main building, lighting upgrade all student occupied buildings

  • Boise Independent

    FY21 Amount: $1,603,769
    Total Since 1990: $40,019,956
    FY20 Use: Rebuild three elementary schools, add cafeterias at three locations, paint, flooring, HVAC, roofing

  • Bonner County (former)

    FY21 Amount: $0
    Total Since 1990: $1,891,107
    FY20 Use: Closed

  • Bonneville Joint

    FY21 Amount: $909,817
    Total Since 1990: $15,494,975
    FY20 Use: Routine maintenance and repairs on student occupied buildings, roof repairs, gymnasium bleachers

  • Boundary County

    FY21 Amount: $89,046
    Total Since 1990: $2,528,940
    FY20 Use: Regular maintenance of buildings, including salaries and benefits. New ADA bathroom at middle school. Upgrade lighting, gym floor re-coat, science room remodels, new classroom flooring

  • Bruneau-Grand View Joint

    FY21 Amount: $19,437
    Total Since 1990: $713,251
    FY20 Use: Changed lights out to retrofit, put on new door locks, remodeled bathroom - replaced sinks and toilets, overhauled water system, commercial water softening system, security system installed. General maintenance of the three school buildings.

  • Buhl Joint

    FY21 Amount: $83,222
    Total Since 1990: $2,142,920
    FY20 Use: Replace furnaces, install LED lighting, repair and replace restroom fixtures and plumbing. Replace all internal asbestos door with wood doors and new lock sets

  • Butte County

    FY21 Amount: $25,078
    Total Since 1990: $920,013
    FY20 Use: Annual inspections, quarterly alarm monitoring, refinish gym floors, paint, replace carpet, repair and update lighting, bathroom repairs, boiler repairs, salary and benefits

  • COSSA (Centerpoint Alt Sec Sch)

    FY21 Amount: $8,374
    Total Since 1990: $106,698
    FY20 Use: General maintenance items including maintenance salaries/benefits, materials/supplies, and HVAC/alarm system maintenance and repairs

  • Caldwell

    FY21 Amount: $377,224
    Total Since 1990: $9,399,874
    FY20 Use: Roof maintenance, HVAC maintenance, plumbing maintenance, asbestos abatement

  • Camas County

    FY21 Amount: $12,311
    Total Since 1990: $312,486
    FY20 Use: Concrete repairs at the high school, repairs to high school entrance, plumbing repairs at the elementary, roofing repairs, boiler repairs at the high school

  • Cambridge Joint

    FY21 Amount: $11,126
    Total Since 1990: $323,085
    FY20 Use: Ongoing daily maintenance, re-siding of the elementary school, repair of propane leaks

  • Cascade

    FY21 Amount: $13,619
    Total Since 1990: $517,773
    FY20 Use: repairs and engineering fees on little gym, new lighting for outside buildings, HVAC repairs and maintenance.

  • Cassia County Joint

    FY21 Amount: $392,308
    Total Since 1990: $8,446,944
    FY20 Use: $138K of HVAC repairs/replacement, $25k of lighting upgrades, $184k of flooring replacement, $35k of door/window replacement, $117k of gym floor refinishing, $11k of roof repair, contracted maintenance services and salaries

  • Castleford Joint

    FY21 Amount: $22,345
    Total Since 1990: $547,411
    FY20 Use: Maintenance salary/benefits; supplies; MS, HS bathroom fixtures, new carpet in building hallways; heater/softeners; new floor stripper

  • Challis Joint

    FY21 Amount: $20,567
    Total Since 1990: $821,089
    FY20 Use: Maintenance personnel salary and benefits, building trusses in CHS gym, supplies and materials, heat unit replacements, contract repairs

  • Chief Tahgee Elementary Academy

    FY21 Amount: $7,205
    Total Since 1990: $54,135
    FY20 Use: Not required to report

  • Clark County Joint

    FY21 Amount: $7,853
    Total Since 1990: $324,616
    FY20 Use: Walk in cooler freezer for elementary school, repair of furnace in wood shop, replaced 2 boilers

  • Coeur d' Alene

    FY21 Amount: $684,157
    Total Since 1990: $15,129,010
    FY20 Use: Continue remodel of Lakes Middle School, fire system maintenance on schools, lockers, flooring at various schools, painting at various schools, ionizers and HVAC upgrades, new roof Lakes MS, lockers updated at Dalton

  • Coeur d' Alene Charter Academy

    FY21 Amount: $41,637
    Total Since 1990: $610,337
    FY20 Use: HVAC systems, roofing repairs and general repairs and maintenance

  • Compass Charter School

    FY21 Amount: $83,507
    Total Since 1990: $697,124
    FY20 Use: Several bathroom repairs/upgrades necessary in Cherry Lane building, which has been sold. Several ongoing projects, including painting, electrical, carpet replacement, and fire system

  • Connor Academy (formerly Roosevelt Center)

    FY21 Amount: $36,328
    Total Since 1990: $368,540
    FY20 Use: General facility maintenance needs including repainting hallways.

  • Cottonwood Joint

    FY21 Amount: $28,166
    Total Since 1990: $753,404
    FY20 Use: Regular Maintenance, New Carpeting in Band Room, Final Roof Repairs on Elementary, Roof Repairs at Jr. Sr. High, Update of Bell System both buildings, Final Heating Project at Jr. Sr. High

  • Council

    FY21 Amount: $19,363
    Total Since 1990: $511,101
    FY20 Use: Refinished stage floor and ceiling, updated high school bathrooms, daily ongoing maintenance

  • Culdesac Joint

    FY21 Amount: $7,587
    Total Since 1990: $282,225
    FY20 Use: Classrooms: upgrade electrical & clean carpets, cleanout sewer lines, repair fire alarm system, refinish gym floor & safety remodel project for entryway into school building

  • Dietrich

    FY21 Amount: $14,173
    Total Since 1990: $363,963
    FY20 Use: Locker room repair, classroom updates, general maintenance, floor upkeep, drywall patching and painting, complete remainder of door knob and lock replacement

  • Doral Academy of Idaho

    FY21 Amount: $10,203
    Total Since 1990: $10,203
    FY20 Use: Not required to report

  • Elevate Academy

    FY21 Amount: $28,044
    Total Since 1990: $51,520
    FY20 Use: Not required to report

  • Emmett Independent

    FY21 Amount: $158,451
    Total Since 1990: $4,283,575
    FY20 Use: Fire suppression line repairs - carb; re-carpet classrooms - EMS; fire panel - BV; blower/boiler repairs - Carb; fire system repairs - SB; boiler repairs; gym roof repairs/carpet replacement - EMS; roof repairs - Sweet

  • Falcon Ridge Charter School

    FY21 Amount: $18,663
    Total Since 1990: $291,360
    FY20 Use: Painting, floor refinishing, annual maintenance of HVAC, fire alarms, security alarms, rodent control

  • FernWaters Public Charter School

    FY21 Amount: $4,244
    Total Since 1990: $8,559
    FY20 Use: Not required to report

  • Filer

    FY21 Amount: $107,176
    Total Since 1990: $2,292,160
    FY20 Use: Salaries, benefits, repair: security systems, painting, windows, furnaces, repair bathrooms, bathroom fixtures, plumbing, carpets

  • Firth

    FY21 Amount: $56,593
    Total Since 1990: $1,420,697
    FY20 Use: Carpet, plumbing repair, roof replacement, paint, furnaces, and brick wall repair

  • Forge International School

    FY21 Amount: $25,607
    Total Since 1990: $45,561
    FY20 Use: Not required to report

  • Forrest M. Bird Charter School

    FY21 Amount: $19,673
    Total Since 1990: $288,442
    FY20 Use: General repairs and maintenance, including work done on HS heating system, fire sprinkler system fixed and updated, electrical work, additional work/supplies for new door locking system installed in 2018-2019, paint for inside both buildings

  • Fremont County Joint

    FY21 Amount: $143,888
    Total Since 1990: $3,865,796
    FY20 Use: Upgrade LED lighting all schools, HVAC SFHS, Resurface Gym Floors - SFHS, NFHS, outside security doors - SFJH, SFHS

  • Fruitland

    FY21 Amount: $111,651
    Total Since 1990: $2,520,978
    FY20 Use: Salaries/benefits for maintenance staff, yearly school building in maintenance repairs. Repair gym furnace/HVAC repairs, roof repairs.

  • Future Public School, Inc

    FY21 Amount: $22,842
    Total Since 1990: $62,198
    FY20 Use: Emergency leak repairs, failed A/C unit repair, handyman hired for small repairs, significant door repair. Total costs up to $20, 726.77. The amount re-potted through accounts 664 include our lease payments which are not maintenance expenses.

  • Garden City Community School

    FY21 Amount: $0
    Total Since 1990: $46,611
    FY20 Use: Closed

  • Garden Valley

    FY21 Amount: $20,795
    Total Since 1990: $469,445
    FY20 Use: Safety inspections, replace tile flooring, maintain SBR and well, maintenance/custodial fraction of salary. Repair and replace heating and cooling equipment. Electrical work, storage closet built for McKinney Vento

  • Gem Prep - Nampa

    FY21 Amount: $28,763
    Total Since 1990: $116,742
    FY20 Use: Not required to report

  • Gem Prep: Meridian

    FY21 Amount: $31,725
    Total Since 1990: $80,263
    FY20 Use: Not required to report

  • Gem Prep: Online

    FY21 Amount: $37,457
    Total Since 1990: $100,505
    FY20 Use: Not required to report

  • Gem Prep: Pocatello

    FY21 Amount: $28,239
    Total Since 1990: $74,345
    FY20 Use: Not required to report

  • Genesee Joint

    FY21 Amount: $19,762
    Total Since 1990: $532,588
    FY20 Use: Exterior brick sealing of 1912 building, roof repair, painting, regular maintenance of building

  • Glenns Ferry Joint

    FY21 Amount: $26,277
    Total Since 1990: $860,262
    FY20 Use: Floors in gymnasium, remodeled showers, replaced HVAC unit, carpeted rooms, middle school bleachers

  • Gooding Joint

    FY21 Amount: $87,691
    Total Since 1990: $2,037,252
    FY20 Use: Lighting upgrades, GEMS cooling tower upgrade, painting, gym floors, security upgrades

  • Grace Joint

    FY21 Amount: $35,032
    Total Since 1990: $910,544
    FY20 Use: Maintenance staff salaries and benefits, carpet classrooms, replaced entry doors, regulator on heating system, exterior security light upgrade, asphalt bus loading zone

  • Grangeville Joint (former)

    FY21 Amount:
    Total Since 1990: $1,154,685
    FY20 Use: Closed

  • Hagerman Joint

    FY21 Amount: $25,897
    Total Since 1990: $633,444
    FY20 Use: Replace lunch room freezer; remodel bathrooms; ag building addition; carpet, chairs & whiteboards; ongoing general maintenance

  • Hansen

    FY21 Amount: $22,401
    Total Since 1990: $611,590
    FY20 Use: Sewer and waterline repairs, new carpet, new windows in elementary, replaced condensate tank on boiler at high school, boiler repairs, repairs on heaters, general maintenance and upkeep.

  • Hayden Canyon Charter School

    FY21 Amount: $20,172
    Total Since 1990: $20,172
    FY20 Use: New School This Year

  • Heritage Academy

    FY21 Amount: $11,605
    Total Since 1990: $107,535
    FY20 Use: Boiler maintenance and repairs, part-time maintenance supervisor, electrical repairs

  • Heritage Community Charter

    FY21 Amount: $34,079
    Total Since 1990: $314,376
    FY20 Use: During the summer, maintenance staff repair damaged walls, repaint, service HVAC, water, kitchen and electrical systems; floor repairs & refinish; during school year; emergency light repair, fire alarm repair, water fountain repair

  • Hidden Springs Charter School (closed)

    FY21 Amount: $0
    Total Since 1990: $115,934
    FY20 Use: Closed

  • Highland Joint

    FY21 Amount: $10,661
    Total Since 1990: $403,480
    FY20 Use: Ongoing repairs and maintenance. Gym lobby bathrooms updated, new water bottle fountains installed. Painting done, carpet replaced. Intercom system and camera system installed where none existed.

  • Homedale Joint

    FY21 Amount: $84,087
    Total Since 1990: $1,989,717
    FY20 Use: General building maintenance, building repair, roof repair/replacement, floor covering repair/replacement, HVAC repair, install/replace security cameras, repair/replace doors

  • Horseshoe Bend

    FY21 Amount: $15,039
    Total Since 1990: $478,337
    FY20 Use: Home-Ec kitchen remodeled to 90% completion, HVAC unit replaced in MS (1) and in Elementary School (1), Gym remodeled including ceiling, flooring and walls, power and water run to dugouts, Moreton Property Ins.

  • Idaho Arts Charter School

    FY21 Amount: $86,545
    Total Since 1990: $813,178
    FY20 Use: General facility repairs, plumbing HVAC, painting, small repairs

  • Idaho College & Career Readiness Academy

    FY21 Amount: $19,110
    Total Since 1990: $68,809
    FY20 Use: Not required to report

  • Idaho Connects Online School

    FY21 Amount: $19,275
    Total Since 1990: $194,430
    FY20 Use: Not required to report

  • Idaho Distance Education Academy

    FY21 Amount:
    Total Since 1990: $664,474
    FY20 Use: Closed

  • Idaho Falls

    FY21 Amount: $678,345
    Total Since 1990: $16,343,584
    FY20 Use: General maintenance and repair of student occupied buildings - district -wide roofing projects at various schools, HVAC repairs at various student occupied buildings, replace worn carpeting, replace worn doors

  • Idaho Leadership Academy (closed)

    FY21 Amount:
    Total Since 1990: $27,390
    FY20 Use: Closed

  • Idaho School for the Deaf and Blind

    FY21 Amount: $7,668
    Total Since 1990: $90,635
    FY20 Use: Not required to report

  • Idaho Science & Technology Charter School

    FY21 Amount: $19,289
    Total Since 1990: $196,326
    FY20 Use: Electrical and fire suppression system for student occupied buildings

  • Idaho Virtual Academy

    FY21 Amount: $267,776
    Total Since 1990: $2,392,496
    FY20 Use: Not required to report

  • Inspire Virtual Charter School

    FY21 Amount: $125,505
    Total Since 1990: $741,796
    FY20 Use: Not required to report

  • Island Park Charter School

    FY21 Amount: $1,097
    Total Since 1990: $1,097
    FY20 Use: New School this Year

  • Jefferson County Joint

    FY21 Amount: $431,946
    Total Since 1990: $7,577,135
    FY20 Use: Routine maintenance repairs, fire system repairs, boiler repairs, security systems repairs and elevator repairs

  • Jerome Joint

    FY21 Amount: $274,866
    Total Since 1990: $5,440,073
    FY20 Use: Perform regularly scheduled ongoing district-wide maintenance projects. District-wide carpet and VCT tile replacement. Replacement of HVAC units. Completion of security vestibules. Begin classroom addition at Kindergarten Center.

  • Kamiah Joint

    FY21 Amount: $26,813
    Total Since 1990: $884,893
    FY20 Use: New Walk-in freezer; lunchroom, Restructure Weight room floor, Maintain facilities, Maintenance salaries and supplies

  • Kellogg Joint

    FY21 Amount: $69,192
    Total Since 1990: $2,184,005
    FY20 Use: Replacing water lines at Pine Hurst Elementary $191,779, general maintenance and repairs to keep student occupied buildings operational

  • Kendrick Joint

    FY21 Amount: $17,296
    Total Since 1990: $514,295
    FY20 Use: New flooring in both schools, new drinking fountains bottle/filler stations, paint gym walls, office, sick room, old district office, install district vault room, purchase portable tables, replace old doors in office

  • Kimberly

    FY21 Amount: $128,055
    Total Since 1990: $2,418,335
    FY20 Use: Salaries, benefits, supplies, and contracted services required to maintain student-occupied buildings, HVAC repairs - district-wide. Carpet replacement KES library, window sill replacement MS

  • Kootenai Bridge Academy Charter School

    FY21 Amount: $15,887
    Total Since 1990: $168,246
    FY20 Use: Roofing repairs and maintenance, heating repairs and maintenance, replace old lighting

  • Kootenai Joint

    FY21 Amount: $11,109
    Total Since 1990: $421,788
    FY20 Use: Heating system in elementary multipurpose room, new LED exterior lights, new JR high school front doors, new breezeway doors, new locks for entire complex, repair drywall in high school

  • Kuna Joint

    FY21 Amount: $372,647
    Total Since 1990: $6,584,272
    FY20 Use: General maintenance, HVA replacement and repair, carpeting. Door hardware, roof replacement, carpeting, flooring, plumbing and fixtures, painting, boiler replacement.

  • Lake Pend Oreille

    FY21 Amount: $240,556
    Total Since 1990: $4,777,317
    FY20 Use: Roof repairs, hallway tiling and carpeting, sewer repairs, interior pipe repairs, painting, window and door upgrades, and general proactive maintenance

  • Lakeland

    FY21 Amount: $295,836
    Total Since 1990: $6,499,261
    FY20 Use: LHS and LJHS roof repairs, plumbing repairs, HVAC, fire panels replacement

  • Lapwai

    FY21 Amount: $32,559
    Total Since 1990: $857,131
    FY20 Use: Ongoing repairs and Maintenance. Replaced flat roof membrane on middle/high school. Carpet in several classrooms replaced

  • Legacy Charter School

    FY21 Amount: $18,929
    Total Since 1990: $184,757
    FY20 Use: Normal repair and maintenance

  • Lewiston Independent

    FY21 Amount: $311,886
    Total Since 1990: $7,723,571
    FY20 Use: Jenifer Junior (middle) high roof with HVAC units, equipment for the new Career Technical Education building, repair Webster Roof, high school cooling control panel, replace floor coverings, and build/install cabinets

  • Liberty Charter School

    FY21 Amount: $27,364
    Total Since 1990: $488,759
    FY20 Use: Replacement of two HVAC units, repair to three others, rain gutter replacement, some painting inside building, floors refinished, carpets replaced in HS, improved building lighting

  • MOSAIC

    FY21 Amount: $18,433
    Total Since 1990: $18,433
    FY20 Use: New School this Year

  • Mackay Joint

    FY21 Amount: $15,111
    Total Since 1990: $417,999
    FY20 Use: Annual inspections, refinish gym & stage floors, boiler repair & upgrade, replace bathroom sinks, replace carpet, exhaust fan for kitchen, sprinklers in boiler room, new bleachers, clean heat vents

  • Madison

    FY21 Amount: $350,056
    Total Since 1990: $7,512,966
    FY20 Use: MMS & JHS HVAC upgrades, boiler replacement, boiler repairs, refinish gym floors

  • Marsh Valley Joint

    FY21 Amount: $80,139
    Total Since 1990: $2,261,157
    FY20 Use: HVAC, roofing

  • Marsing Joint

    FY21 Amount: $57,511
    Total Since 1990: $1,303,122
    FY20 Use: Finish H.S. remodel; security cameras - H.S. Cafeteria/new MS; Ag Bldg. intercom/networking; badge scan/cam for HS/MS; maint sal/ben (30%) heat/cool HS geothermal units; Bldgs. Alarms & security updates

  • McCall-Donnelly Joint

    FY21 Amount: $87,887
    Total Since 1990: $1,768,378
    FY20 Use: Flooring replacement, painting, door access controls replacement, HVAC controls replacement, sound panel installation and siding replacement

  • Meadows Valley

    FY21 Amount: $10,385
    Total Since 1990: $335,056
    FY20 Use: Electrical, classroom lights, asbestos removal

  • Melba Joint

    FY21 Amount: $60,506
    Total Since 1990: $1,232,504
    FY20 Use: Repairs to HVAC system, floor refinishing, classroom light updates, repair to front steps (deemed serious safety hazard by the Division of Building Safety - Letter on file), updates to JSR restrooms and JRSR PE shower facilities

  • Meridian Charter High School

    FY21 Amount: $13,720
    Total Since 1990: $244,860
    FY20 Use: Not required to report

  • Meridian Medical Arts Charter High School

    FY21 Amount: $12,803
    Total Since 1990: $227,436
    FY20 Use: Not required to report

  • Middleton

    FY21 Amount: $271,023
    Total Since 1990: $4,758,510
    FY20 Use: HVAC, fire suppression and water heater repair and upgrades, security doors and floor coverings

  • Midvale

    FY21 Amount: $8,284
    Total Since 1990: $239,142
    FY20 Use: General maintenance supplies; maintenance of plumbing; repair of ballasts, refinish gym floor. State fire inspection contract; painting supplies, new carpeting elementary building.

  • Minidoka County Joint

    FY21 Amount: $287,601
    Total Since 1990: $7,006,514
    FY20 Use: Doors, locks, security systems, cameras, HVAC, boiler, Mt Harrison Electrical Upgrade, general School Building Maintenance, Carpet and Paint

  • Monticello Montessori School

    FY21 Amount: $13,880
    Total Since 1990: $149,105
    FY20 Use: No description provided.

  • Moscow

    FY21 Amount: $145,071
    Total Since 1990: $3,822,739
    FY20 Use: Domestic water softener at Lena Elementary, HVAC improvements throughout all buildings, and video surveillance upgrades in all buildings

  • Moscow Charter School

    FY21 Amount: $12,828
    Total Since 1990: $176,417
    FY20 Use: Flooring, HVAC repair, new air conditioner, window replacement, general maintenance

  • Mountain Home

    FY21 Amount: $247,300
    Total Since 1990: $6,344,128
    FY20 Use: New roof and HVAC at Stephensen Elementary, paint, new carpet, new tiles, sewer line replacement, drain installation

  • Mountain View

    FY21 Amount: $77,410
    Total Since 1990: $1,220,735
    FY20 Use: Maintenance personnel, concrete floor polishing training & equipment; ADA compliance redo GEMS entrance; flooring; HVAC repair; gym floor refinishing; light fixture replacement; security camera upgrades

  • Mullan

    FY21 Amount: $6,054
    Total Since 1990: $255,162
    FY20 Use: High school hall repairs/boiler repairs

  • Murtaugh Joint

    FY21 Amount: $26,402
    Total Since 1990: $483,955
    FY20 Use: General upkeep, painting, and carpets

  • Nampa

    FY21 Amount: $896,796
    Total Since 1990: $19,972,660
    FY20 Use: General maintenance, HVAC upgrades at two elementary schools, roof repair at high school, middle school interior remodel

  • Nampa Classical Academy Charter

    FY21 Amount:
    Total Since 1990: $22,337
    FY20 Use: Closed

  • New Plymouth

    FY21 Amount: $64,855
    Total Since 1990: $1,542,382
    FY20 Use: Electrical repairs, recoat gym floors, paint, Maintain fire alarm system, replace flooring, replace bathroom stalls, HVAC repairs and maintenance, replace doors and hardware

  • Nezperce Joint

    FY21 Amount: $11,082
    Total Since 1990: $311,009
    FY20 Use: Gym Boiler feed unit, carpet installation, insulated garage door for ag shop, new flooring in science room, regular building maintenance

  • North Gem

    FY21 Amount: $9,803
    Total Since 1990: $338,640
    FY20 Use: Salaries and benefits for maintenance personnel, additional summer labor, painting, roof repairs, replace flooring in science classroom, miscellaneous building upgrades and maintenance

  • North Idaho Stem Charter School

    FY21 Amount: $38,306
    Total Since 1990: $268,673
    FY20 Use: Building maintenance - general, HVAC repair

  • North Star Charter School

    FY21 Amount: $65,810
    Total Since 1990: $803,130
    FY20 Use: General maintenance of the facility; classroom and hallway floor resurfacing; interior and exterior repairs and painting; HVAC maintenance

  • North Valley Academy

    FY21 Amount: $13,499
    Total Since 1990: $197,673
    FY20 Use: Change out last of classroom heating system from boiler to RTU units, maintenance/repair of existing heating/cooling s system, replace flooring, electrical for new RTU units

  • Notus

    FY21 Amount: $22,878
    Total Since 1990: $623,316
    FY20 Use: R&R roof in gym; R&R weight room floor; R&R HVAC units; replace gym bleachers; replaced old light fixtures; continuing to change out locks/keys across campus

  • OWL Charter Academy

    FY21 Amount:
    Total Since 1990: $14,946
    FY20 Use: Closed

  • Odyssey Charter School

    FY21 Amount:
    Total Since 1990: $19,062
    FY20 Use: Closed

  • Oneida County

    FY21 Amount: $527,312
    Total Since 1990: $2,324,876
    FY20 Use: We are planning a large asbestos removal project late in this fiscal year

  • Orofino Joint

    FY21 Amount: $78,511
    Total Since 1990: $2,258,190
    FY20 Use: Boiler maintenance and repairs at OES, transformer repairs and electrical updates, roof repairs, AC/Heat units, elevator/ADA

  • Palouse Prairie Charter School

    FY21 Amount: $13,130
    Total Since 1990: $124,517
    FY20 Use: Not required to report

  • Parma

    FY21 Amount: $69,504
    Total Since 1990: $1,692,985
    FY20 Use: Refinish gym floors; roof repairs at MS buildings and elementary; replaced compressors; installation/repairs on water heater; installed heat pump; repair water damage in HS; new furnace at HS; repair HVAC; security camera

  • Pathways in Education - Nampa

    FY21 Amount: $16,649
    Total Since 1990: $65,083
    FY20 Use: Not required to report

  • Payette Joint

    FY21 Amount: $87,755
    Total Since 1990: $2,670,140
    FY20 Use: McCain Middle School roof replacement, window and fire alarm system at Westside; elementary school, electrical upgrade PHS Ag Building, 4 rooms of carpet at 3 schools

  • Payette River Technical Academy

    FY21 Amount: $10,214
    Total Since 1990: $151,835
    FY20 Use: Not required to report

  • Peace Valley Charter, Inc.

    FY21 Amount: $22,561
    Total Since 1990: $63,016
    FY20 Use: Not required to report

  • Pinecrest Academy of Idaho

    FY21 Amount: $8,757
    Total Since 1990: $8,757
    FY20 Use: New School this Year

  • Pleasant Valley Elementary

    FY21 Amount: $1,130
    Total Since 1990: $30,256
    FY20 Use: Replaced wooden soffit on school building. Metal roof checked; replaced missing screws and added new ones to ensure metal roof was securely attached

  • Plummer / Worley Joint

    FY21 Amount: $25,554
    Total Since 1990: $766,025
    FY20 Use: Reinforced material & sprayed 2 coats of rubber coating on roof of gym at middle school; high school roof on new wing had same thing done as MS gym roof as well as a spray on insulation foam to help with heat loss. Misc. projects.

  • Pocatello

    FY21 Amount: $822,779
    Total Since 1990: $19,631,004
    FY20 Use: Roofing, restrooms, carpeting, HVAC, remodeling

  • Pocatello Community Charter School

    FY21 Amount: $23,613
    Total Since 1990: $337,089
    FY20 Use: Sewer pump - rewired, routine maintenance, maintenance salary, new furnace in classroom

  • Post Falls

    FY21 Amount: $404,840
    Total Since 1990: $7,969,525
    FY20 Use: PFMS, Ponderosa, Mullan Trail, Seltice reroof and new HVAC upgrades; PFHS roof- HVAC upgrade and boiler replacements for Pondo, RCMS

  • Potlatch

    FY21 Amount: $29,473
    Total Since 1990: $858,218
    FY20 Use: Replaced elementary gutters, purchased portable pressure gates for the high school, purchased elementary gym floor protector/cover, carpet replacement at elementary & high school, modified boy's locker room shower

  • Prairie Elementary

    FY21 Amount: $480
    Total Since 1990: $16,272
    FY20 Use: Water system repairs & regular maintenance.

  • Preston Joint

    FY21 Amount: $152,419
    Total Since 1990: $3,788,165
    FY20 Use: Remodel of existing classrooms, renovations of various facilities, electrical updates, security improvements

  • Project Impact STEM Academy, Inc

    FY21 Amount: $13,948
    Total Since 1990: $46,950
    FY20 Use: Not required to report

  • RISE Charter School, Inc.

    FY21 Amount: $0
    Total Since 1990: $0
    FY20 Use: Closed

  • Renaissance Charter (closed)

    FY21 Amount: $0
    Total Since 1990: $0
    FY20 Use: Closed

  • Richard McKenna Charter High School

    FY21 Amount: $40,020
    Total Since 1990: $398,643
    FY20 Use: Fire alarm system maintenance and monitoring, carpet cleaning, building repairs, plumbing repairs, electrical repairs

  • Richfield

    FY21 Amount: $13,158
    Total Since 1990: $358,290
    FY20 Use: Replacing HVAC system, new windows, new shelving, bathroom repairs, exhaust fans, replaced lights, floor maintenance, boiler repairs

  • Ririe Joint

    FY21 Amount: $48,518
    Total Since 1990: $1,160,381
    FY20 Use: General maintenance of school. We installed climatech to our heating system. This allows us to better control and monitor our heating system.

  • Rockland

    FY21 Amount: $12,627
    Total Since 1990: $307,193
    FY20 Use: Main building roof repairs and siding/exterior wall repairs, classroom plumbing, gymnasium lighting updates

  • Rolling Hills Charter School

    FY21 Amount: $17,477
    Total Since 1990: $243,043
    FY20 Use: Lights, maintenance, gym, cleaning, repairs, and misc. building costs

  • SEI Tec

    FY21 Amount: $14,087
    Total Since 1990: $120,906
    FY20 Use: Not required to report

  • Sage International School of Boise

    FY21 Amount: $66,674
    Total Since 1990: $541,191
    FY20 Use: General care/repair of building internal surfaces, fixtures and systems

  • Salmon

    FY21 Amount: $45,638
    Total Since 1990: $1,591,282
    FY20 Use: Elementary school bathroom upgrades, replacement of windows and carpeting, secondary schools replace heat pump, new door, heating system upgrade finish roof upgrade

  • Salmon River Joint

    FY21 Amount: $8,224
    Total Since 1990: $159,513
    FY20 Use: Flooring, painting classrooms, heating/ air conditioning upgrade, gym floor refinish, upgrade lighting

  • Shelley Joint

    FY21 Amount: $153,164
    Total Since 1990: $3,502,367
    FY20 Use: Salaries & benefits, plumbing repair, boiler repair, new boiler, gym floor refinish, fire alarm services, heat pumps, audio system repair, emergency lighting, new door locks roof repair.

  • Shoshone Joint

    FY21 Amount: $33,312
    Total Since 1990: $838,607
    FY20 Use: Remodel of library; shelving/cabinets replaced in classrooms; carpet rotation; sink replacements in high school; paint gym/classrooms; and flood control repairs around classrooms, hand dryers installed in restrooms

  • Snake River

    FY21 Amount: $154,615
    Total Since 1990: $3,196,861
    FY20 Use: Completion of Junior High wastewater project, paint as needed, correction of regular maintenance & safety issues, electrical & maintenance repairs, repair & replace HVAC systems, replace worn carpet, repair Middle School roof wages & benefits for 3 maintenance personnel

  • Soda Springs Joint

    FY21 Amount: $60,412
    Total Since 1990: $1,595,418
    FY20 Use: abate classrooms for new carpet, new CAT 6 Data wire, secure entrance at elementary school, new heating coil in gym, new condensing freezer unit, new water heater, new HS roof section, many heating, plumbing, maintenance projects

  • South Lemhi

    FY21 Amount: $7,860
    Total Since 1990: $231,137
    FY20 Use: Painted locker & shower rooms, remodeled bathrooms, clean & boiler repair, pump septics, repair pressure tank, chain hoist to remove clinkers

  • St. Maries Joint

    FY21 Amount: $60,811
    Total Since 1990: $1,828,347
    FY20 Use: Roofs for 3 buildings, replace siding at HS, floor refinishing and replacement

  • Sugar-Salem Joint

    FY21 Amount: $108,017
    Total Since 1990: $2,392,938
    FY20 Use: Remodel HS weight room, add new cabinets to classrooms at elementary school, HVAC repairs at intermediate school, security camera upgrades to several schools, remodel portable classroom at JH, ceiling repairs at elementary

  • Swan Valley Elementary

    FY21 Amount: $4,390
    Total Since 1990: $117,908
    FY20 Use: Upgraded security system

  • Syringa Mountain School

    FY21 Amount: $8,975
    Total Since 1990: $59,269
    FY20 Use: Classroom maintenance, general building maintenance

  • Tammany Elementry (former)

    FY21 Amount: $0
    Total Since 1990: $57,647
    FY20 Use: Closed

  • Taylor's Crossing Charter School

    FY21 Amount: $23,859
    Total Since 1990: $364,514
    FY20 Use: Library walls installed with locking slides/doors, fire sprinklers replaced, carpets cleaned, gym refinished, installed bottle fillers, new ballast, replaced blinds, garbage disposal repaired, locks repaired, paint

  • Teton County

    FY21 Amount: $118,224
    Total Since 1990: $2,387,154
    FY20 Use: Fire alarm services, boiler maintenance/repair, roof repair, water heater repair

  • The Village Charter School

    FY21 Amount: $16,178
    Total Since 1990: $205,047
    FY20 Use: Flooding issue in classroom/fire sprinkler, mold remediation, paint gym floor, stonework repairs on buildings, AC repairs, misc. repairs: keys made, plumbing, AC issues

  • Thomas Jefferson Charter School

    FY21 Amount: $24,910
    Total Since 1990: $440,377
    FY20 Use: Repairs and maintenance as needed, including refurbishing the gym floor

  • Three Creek Joint Elementary

    FY21 Amount: $206
    Total Since 1990: $17,711
    FY20 Use: Miscellaneous repairs, change out old lighting fixtures, replace exit sign.

  • Treasure Valley Classical Academy

    FY21 Amount: $28,641
    Total Since 1990: $51,099
    FY20 Use: Not required to report

  • Troy

    FY21 Amount: $18,638
    Total Since 1990: $394,465
    FY20 Use: Salaries and benefits for personnel; HS carpet 5 rooms & tile 2 restrooms; Elem school tile multipurpose room; gym floor resurfaced; elementary school fire alarm upgrade; cameras installed in hallways at both schools and entrances

  • Twin Falls

    FY21 Amount: $626,795
    Total Since 1990: $12,407,312
    FY20 Use: Replaced flooring, added security vestibule, installed ramps, updated restrooms, added a greenhouse, updated wiring

  • Upper Carmen Charter School

    FY21 Amount: $3,592
    Total Since 1990: $81,824
    FY20 Use: Deep cleaning, paint, general maintenance and repairs, new carpet

  • Valley

    FY21 Amount: $36,943
    Total Since 1990: $1,072,848
    FY20 Use: Replacement of heating and air conditioning units, roof repairs and maintenance and other ongoing repairs and maintenance

  • Vallivue

    FY21 Amount: $615,032
    Total Since 1990: $9,609,202
    FY20 Use: Various schools carpet/tile repairs, electric/mechanic repairs, restroom upgrades, upgrades to fire/security systems, HVAC repairs, salary/benefits for staff performing repairs

  • Victory Charter School

    FY21 Amount: $24,856
    Total Since 1990: $414,646
    FY20 Use: Normal repair and maintenance

  • Vision Charter School

    FY21 Amount: $49,447
    Total Since 1990: $500,866
    FY20 Use: Salary and benefits for % equivalent for building maintenance personnel, riser room maintenance, keyless access controller maintenance, fire backflow system repair, glass repair, plumbing, roof repair, public address system repair

  • Wallace

    FY21 Amount: $31,840
    Total Since 1990: $1,003,940
    FY20 Use: Install alarm and security system at elementary school. General safety/preventative maintenance including roof enhancements for both schools

  • Weiser

    FY21 Amount: $99,455
    Total Since 1990: $2,556,870
    FY20 Use: Replace carpeting in three classrooms; floor finishing at the high school; HVAC band room; replace water heaters; boiler repair for the middle school

  • Wendell

    FY21 Amount: $73,387
    Total Since 1990: $1,763,084
    FY20 Use: Lighting projects in schools, alarm systems

  • West Ada

    FY21 Amount: $2,578,173
    Total Since 1990: $48,058,637
    FY20 Use: School building maintenance, painting, roofing, HVAC, plumbing, and repairs

  • West Bonner County

    FY21 Amount: $64,633
    Total Since 1990: $1,667,229
    FY20 Use: Floor coverings, door hardware and locks, boiler and HVAC repairs, roofing, alarm and security updates, HS siding

  • West Jefferson

    FY21 Amount: $41,151
    Total Since 1990: $1,128,182
    FY20 Use: Ongoing maintenance and repair of buildings; classroom remodels, plumbing, electrical, and heating repairs

  • West Side Joint

    FY21 Amount: $50,075
    Total Since 1990: $1,025,818
    FY20 Use: Maintenance staff salaries and benefits, maintenance supplies, parking lot repair, track repair, etc.

  • White Pine Charter School

    FY21 Amount: $42,552
    Total Since 1990: $465,754
    FY20 Use: Expansion project for HS-HS building - installed 4 modular on new land, renovated and retrofitted existing buildings, installed science lab. Repaired walls and flooring from flood damage in elementary school

  • Whitepine Joint

    FY21 Amount: $14,586
    Total Since 1990: $350,986
    FY20 Use: Salaries, purchase services, contractor services, supplies, and insurance

  • Whitepine Joint (former)

    FY21 Amount:
    Total Since 1990: $295,791
    FY20 Use: Closed

  • Wilder

    FY21 Amount: $33,080
    Total Since 1990: $783,284
    FY20 Use: Set up additional instructional areas; painting, annual summer maintenance & cleaning, shampoo carpets/refinishing floors; repair/replace HVAC as needed

  • Wings Middle Charter School (Closed)

    FY21 Amount:
    Total Since 1990: $45,998
    FY20 Use: Closed

  • Xavier Charter School

    FY21 Amount: $45,825
    Total Since 1990: $537,297
    FY20 Use: Replace expansion tank for water heater, run power to gym, install new ECB control for office area, regular maintenance; 5 ton coiling unit, LED light upgrade, install drinking fountain, install windows, roof replacement

  • iSucceed Virtual Charter School

    FY21 Amount: $61,223
    Total Since 1990: $442,591
    FY20 Use: Not required to report